Since moving out of our rental home and moving in with the mom-in-law 2 months ago (and having no internet access!!! Hence the reason I've been unable to write!), progress on the house has been PAINFULLY slllooOOOoooOOowwwwww. The fireplace flue problem was finally rectified and we thought things were then gonna move along quickly, but 3 weeks later and still no ETA.
Our last site visit was on the 23rd October, 2 weeks ago. The house was cleaned out - floors mopped, benches wiped down, windows cleaned, all rubbish chucked out. A few things still needed to be fixed like:
- Garage door is the wrong colour - pale off white instead of a timber colour.
- One strip of wall tiling not done in the ensuite.
- Sliding door to be installed for cloak cupboard.
- Small chip in the kitchen stone benchtop.
- Downlights to be installed in Theatre Room.
- Wall light in ensuite placed too high up.
- Broken powerpoint in kitchen.
Last Thursday Metricon's Quality & Assurance guys inspected the house and FAILED it with a score of 94% (passing mark is 95%). We don't know what the problems were, but we were told by our Consultant that the problems were merely aesthetic like the bathtub wasn't polished enough, etc. So, on Monday they came back to do another Q&A inspection and we just found out today that it PASSED!!! Yay! We will be doing our Final Walkthrough tomorrow and if we're happy with everything we can pretty much move in after the paperwork is done. Great news! Finally.
To our disbelief we also found out that our Site Supervisor has resigned and will be leaving in 3 weeks. Mind you, he is our 3rd supervisor! He's been instructed to complete our house before he leaves...yeah bloody better.
So sorry I couldn't post any photos! My camera battery went flat and the charger is packed in the box somewhere.....I'll use my camera phone tomorrow and will post some pics I promise! We are so excited!!!
-G&A